中文日韩字幕,日韩中文字幕在线有码视频网,日韩狠狠操,99香蕉精品视频在线观看,中文字幕高清有码在线中字,日韩视频中文字幕视频一区,亚洲免费专区

  Homepage      Favorite      中文版
Home About Us News info Products Services Recruitment Contact us
NEWS CENTER
Company News
Trade News
Exhibitions
Videos
CONTACT US
Headquarter: No. 18, Yangguang Road, Xinyang Industrial Area, Haicang, Xiamen, P.R.China 361022
Tel: +86-592-6539999
E-mail: bussiness@xmzzj.com

NEWS CENTER
Location:Home → News Center
Six ways of loader operation make you a good loader hand
Public date:2020-6-2   Hits:9657

Here are 6 ways to become a good loader hand! Come and have a look.

 

1. Light

 

During the operation of the loader, keep the heel close to the floor of the cab, keep the foot plate parallel to the accelerator pedal, and press the oil pedal gently.

 

2. Stable

 

When the loader is in operation, the accelerator should always be stable. In general operation, the throttle opening is about 70-80%.

 

3. Separation

 

During the operation of the loader, the foot board shall be separated from the brake pedal and placed flat on the floor of the cab. It is better not to step on the brake pedal.

 

Loaders often work on uneven construction sites. If the foot is always on the brake pedal, the body will move up and down, causing the driver to inadvertently step on the brake pedal.

 

In general, it is necessary to control the engine condition and shift by controlling the throttle deceleration.

 

This not only avoids the brake system overheating caused by frequent braking, but also brings convenience for the loader to speed up quickly.

 

4. Diligent

 

When the loader is working, especially when the shovel is digging, the bucket should be full of materials with the circulation of pulling the lifting and turning stick when the accelerator is stable.

 

Lift and turn the bucket control lever cycle pull is called "frequently.".

 

This process is very important and has a great impact on fuel consumption.

 

5. Coordination

 

Coordination is the organic coordination of lifting and rotating bucket control cylinder. The general process of shovel excavation of loader is first to lay the bucket flat on the ground and drive to the pile smoothly.

 

When the parallel shovel of the bucket encounters resistance to the material pile, the principle of first lifting the arm and then retracting the bucket shall be followed.

 

This can effectively avoid the bottom of the bucket resistance, so as to give full play to the maximum digging force.

 

6. No

 

First of all, do not bang the accelerator. No matter the loader is walking or shoveling, do not press the accelerator pedal hard, and always keep the light stability and smoothness of the accelerator control. Fully reduce and reduce the human failure in operation.

 

Second, it is strictly prohibited to tire slip. During the operation of loader, the phenomenon of tire slipping often occurs in case of resistance and sudden filling valve. This phenomenon is usually caused by improper operation of the driver, which increases fuel consumption and damages the tire.

 

Third, it is strictly prohibited to raise the rear wheel. Due to the large digging force of the loader, the driver usually digs the solid original soil and stone mountain during the operation process, if the operation is improper, the two rear wheels are prone to rise and leave the ground. The landing inertia of this kind of lifting action will cause the edge plate of the bucket to break and the bucket to deform; when the rear wheel is very high, it is easy to cause the welding joints of the front and rear frames and even the plate to break.

 

Fourth, it is strictly prohibited to impact the pile. For digging common materials, the loader can use the second gear (seven speed gearbox, three speed gearbox is forbidden to use the second gear) to operate. It is forbidden to use the gear above the second gear to carry out inertial impact on the pile. The correct way is to shift the bucket to gear I in time when approaching the pile to complete a shoveling process.

Article source networ
All rights reserved
Please contact us in time to deal with copyright issues, thank you!

 

Previous  |  Next  |   Return to
About Us
Company profile
Culture
Organizational
Development
Subsidiaries
Certificates
Products
Wheel Loader
Block Handling Wheel Loader
Excavator
Other
Spare Parts
News
Company News
Trade News
Exhibitions
Videos
Services
Marketing
After Services
Question
Downloads
Recruitment
Talent Concept
Jobs
Contact Us
Feedback
Contact us
Copyright 2014- (C) Xiamen Loaders Co., Ltd. All Rights Reserved.
Two-dimensional [Close]

點(diǎn)擊這里給我發(fā)消息
點(diǎn)擊這里給我發(fā)消息
长泰县| 凤冈县| 霍林郭勒市| 仪征市| 赣州市| 广宗县| 台湾省| 都匀市| 韩城市| 泉州市| 海阳市| 万州区| 惠州市| 吉木乃县| 霍山县| 田阳县| 千阳县| 扎兰屯市| 深泽县| 东城区| 凤冈县| 蓬莱市| 新巴尔虎右旗| 云霄县| 沙河市| 若尔盖县| 新津县| 鄂伦春自治旗| 铜鼓县| 盐亭县| 娄底市| 龙江县| 同仁县| 石屏县| 正镶白旗| 商水县| 同心县| 辉南县| 突泉县| 绥芬河市| 罗定市|